Skip to main content
Log in/Register
  • Create new account
  • Request new password
  • Home
  • News
  • About ANKOM
  • Contact Us
ANKOM Technology logo
  • Product Catalog

    Our Product Catalog

    • Vitamin, Cholesterol & Total Fat
    • Dietary Fiber
    • Crude/Detergent Fiber
      • DELTA
      • |
      • A2000
      • |
      • A200
    • Total/Crude Fat
      • XT15
      • |
      • XT10
      • |
      • HCI

    • Gas Fermentation Measurement
    • In Vitro Incubation
    • Filters, In Situ & Support Products
    • Chemicals And Enzymes
      • Chemicals
      • |
      • Enzymes
      • |
      • Certificates of Analysis

  • Technical Support

    Technical Support

    • FLEX Vitamin & Cholesterol
    • TDF Analyzer
    • Fiber Analyzers
      • DELTA
      • |
      • A2000
      • |
      • A200
    • Fat Extractors
      • XT15
      • |
      • XT10

    • Hydrolysis System and RD Dryer
    • RF Gas Production System
    • Daisy Incubator
  • Analytical Procedures & Support

    Analytical Methods & Support

    • FLEX Vitamin & Cholesterol
    • Dietary Fiber
    • Crude/Detergent Fiber
      • DELTA
      • |
      • A2000
      • |
      • A200

    • Total/Crude Fat
      • XT15
      • |
      • XT10
      • |
      • HCI
    • Gas Fermentation Measurement
    • In Vitro Incubation

  • Case Studies
    • Eurofins, Des Moines
    • Dupont Pioneer Livestock Nutrition Ctr
    • Hebron University
    • Dairy One Cooperative
    • EPL Bio Analytical Services
    • Kuwait Institute for Scientific Research
  • Global Distribution
0 items

What should be done if one of the brass supply valve is leaking or shows signs of corrosion within the valve?

Over a period of years the buffer valve and possibly others, may begin to corrode the brass valve body. As of November 2022, the Buffer valve in new instruments come with a PEEK chemical resistant valve body, however older instruments may show signs of internal corrosion, pitting and leaking buffer, pulling this reagant in and not sealing internally as it once did. To change this component follow Service Procedure TS046.

Related Links

Contact Us
Global Distribution
Warranty Information
arrow-white-footer.pngHave Questions or Feedback?
Connect
Follow us on TwitterFind us on FacebookConnect with us on LinkedIN

Menu

  • Product Catalog
  • Technical Support
  • Analytical Methods & Support
  • Case Studies
  • Global Distribution
  • Privacy Policy
  • Refund Policy

ANKOM Technology

©2023 ANKOM Technology All Rights Reserved
ANKOM Technology 2052 O'Neil Road, Macedon NY 14502
Tel: 315.986.8090 | Fax: 315.986.8091
x

We use cookies on this site to enhance your user experience. By clicking any link on this page you are giving your consent for us to set cookies. Read our Privacy Policy.