Skip to main content
Log in/Register
  • Create new account
  • Request new password
  • Home
  • News
  • About ANKOM
  • Contact Us
ANKOM Technology logo
  • Product Catalog

    Our Product Catalog

    • Vitamin, Cholesterol & Total Fat
    • Dietary Fiber
    • Crude/Detergent Fiber
      • DELTA
      • |
      • A2000
      • |
      • A200
    • Total/Crude Fat
      • XT15
      • |
      • XT10
      • |
      • HCI

    • Gas Fermentation Measurement
    • In Vitro Incubation
    • Filters, In Situ & Support Products
    • Chemicals And Enzymes
      • Chemicals
      • |
      • Enzymes
      • |
      • Certificates of Analysis

  • Technical Support

    Technical Support

    • FLEX Vitamin & Cholesterol
    • TDF Analyzer
    • Fiber Analyzers
      • DELTA
      • |
      • A2000
      • |
      • A200
    • Fat Extractors
      • XT15
      • |
      • XT10

    • Hydrolysis System and RD Dryer
    • RF Gas Production System
    • Daisy Incubator
  • Analytical Procedures & Support

    Analytical Methods & Support

    • FLEX Vitamin & Cholesterol
    • Dietary Fiber
    • Crude/Detergent Fiber
      • DELTA
      • |
      • A2000
      • |
      • A200

    • Total/Crude Fat
      • XT15
      • |
      • XT10
      • |
      • HCI
    • Gas Fermentation Measurement
    • In Vitro Incubation

  • Case Studies
    • Eurofins, Des Moines
    • Dupont Pioneer Livestock Nutrition Ctr
    • Hebron University
    • Dairy One Cooperative
    • EPL Bio Analytical Services
    • Kuwait Institute for Scientific Research
  • Global Distribution
0 items

Why do the enzyme tubes appear discolored (yellow or brownish) or gelled?

This issue may occur if the instrument is not fully purged of the residual enzyme left in the supply lines, especially Trizma.  ANKOM recommends flushing the enzyme supply lines with alcohol weekly when enzymes are being used.  Further, we recommend flushing the supply line immediately after an analysis performed using Trizma, due to the high probability of crystallization of Trizma in the lines.  Residue in supply lines will cause discoloration, gelling and complete blockage of the supple lines. 

If enzyme tubes have become discolored (turned yellow or brownish) or if the enzyme has begun to gel in the tubes, they will require replacement.  Refer to TDF Service Procedure TS004 for instructions on replacement.  Contact ANKOM Technology at https://www.ankom.com/contact/technical-services or call 315-986-8090 to purchase your Enzyme Tubing Replacement Kit (TDF67).

 
Related Documents: 

Tube Replacement (Enzymes)

AttachmentSize
PDF icon TS004_Tube_Replacement_Enzymes.pdf841.65 KB

Related Links

Contact Us
Global Distribution
Warranty Information
arrow-white-footer.pngHave Questions or Feedback?
Connect
Follow us on TwitterFind us on FacebookConnect with us on LinkedIN

Menu

  • Product Catalog
  • Technical Support
  • Analytical Methods & Support
  • Case Studies
  • Global Distribution
  • Privacy Policy
  • Refund Policy

ANKOM Technology

©2023 ANKOM Technology All Rights Reserved
ANKOM Technology 2052 O'Neil Road, Macedon NY 14502
Tel: 315.986.8090 | Fax: 315.986.8091
x

We use cookies on this site to enhance your user experience. By clicking any link on this page you are giving your consent for us to set cookies. Read our Privacy Policy.