Instruments
Product Categories
Resources
FAQ Group
Refer to TDF Service Procedure Tube Replacement Enzymes (TS004) and review the steps related to relaxing or pre-stressing the replacement silicone tubing by rolling them with a rod or dowel.
This issue may occur if the instrument is not fully purged of the residual enzyme left in the supply lines, especially Trizma. ANKOM recommends flushing the enzyme supply lines with alcohol weekly when enzymes are being used. Further, we recommend...
The enzyme tubing may be clogged. Look at the enzyme tubing from the reservoirs to the Enzyme Pinch Valve and beyond to the manifold. If there is any discoloration or gelled material in the tubing, replace the tubing. Contact ANKOM Technology at...
The following are two possible reasons why enzymes may not be drawn from the reservoir. (1) The silicone tubes may be worn or flattened from use. To inspect the tubing, refer to TDF Service Procedure Tube Replacement (Pinch Valves) (TS005) and...